Paul Brown Lofts
Owner/Developer: Pyramid Development
Architect: Rosemann
Engineer: Design/Build
Duration of Project: 18 months
Completion Date: June 2005
General Contractor: Paric Corporation
Building Scope:
Conversion of historic office building to 224 loft type apartments.
Services Provided:
Design, engineering, coodination, and installation of plumbing system.
Challenges:
The existing structure presented numerous challenges as the team worked to maintain as much of
the historic architectural features as possible. Because of this we had to consider the existing
corridors, beams, and columns when designing our piping system to limit penetrations and find
areas to conceal piping.
Comments:
This Paul Brown building was one of the first major renovations to lofts downtown and was ahead of
schedule, under budget, and a success for all involved.